Sign in to comment

CrowdFiber Campaign - Customer Admin

9:22AM October 12, 2020

Randall Hendricks

Will every house in Phase 3 receive internet if they have already signed up for it? I live on Rush Branch rd and I cannot tolerate yet another company saying we will send someone out and then nobody actually does.


CrowdFiber Campaign - Customer Admin

5:34PM October 12, 2020

MLConnect Customer Cares Team

MLConnect will be an option for all homes and businesses in the MLEC service area. Members who have registered online will be contacted when we go live in their neighborhood. There are 29 design areas (sections) in Phase 3 for Lewis and Perry counties. For the most part, they will be completed in order. You can find your specific design area by using the interactive map.


CrowdFiber Campaign - Customer Admin

12:36PM October 05, 2020

Jamie Davidson

When will MLEC be available near the marsh creek area in Linden Tn?


CrowdFiber Campaign - Customer Admin

5:22PM October 12, 2020

MLConnect Customer Cares Team

The interactive map on www.mlconnect.com can provide the latest timeline. Just enter your address in the upper right corner to receive information. You can also contact your local MLEC office for updates for your specific address. The Perry County grant areas are where construction began.


CrowdFiber Campaign - Customer Admin

1:45PM October 02, 2020

Jamie Davidson

When will spring circle area be estimated completed I know we are in phase 3 in linden


CrowdFiber Campaign - Customer Admin

5:21PM October 12, 2020

MLConnect Customer Cares Team

The interactive map on www.mlconnect.com can provide the latest timeline. Just enter your address in the upper right corner to receive information. You can also contact your local MLEC office for updates for your specific address.


CrowdFiber Campaign - Customer Admin

9:29AM October 01, 2020

Melissa Becker

I asked in June when crews would return and was told September. It is now October and unfortunately crews havent returned :-( Is there a new time frame for my address?


CrowdFiber Campaign - Customer Admin

4:00PM October 12, 2020

MLConnect Customer Cares Team

With COVID-19 related time sensitive grants, weather, demand and other unforeseen variables, some areas are experiencing a delay. You can enter your address on our interactive map (Service Areas Tab) to keep up with our progress and estimated dates for your specific location. Thank you for your patience. We look forward to serving you!


CrowdFiber Campaign - Customer Admin

4:00PM October 12, 2020

MLConnect Customer Cares Team

With COVID-19 related time sensitive grants, weather, demand and other unforeseen variables, some areas are experiencing a delay. You can enter your address on our interactive map (Service Areas Tab) to keep up with our progress and estimated dates for your specific location. Thank you for your patience. We look forward to serving you!


CrowdFiber Campaign - Customer Admin

10:25PM September 22, 2020

James Pollock

What is the timeline for Memorial Rd in Hohenwald?


CrowdFiber Campaign - Customer Admin

9:15AM October 01, 2020

MLConnect Customer Cares Team

Lewis County is part of Phase 3. We'll be able to provide estimated timelines for the 29 sections of Phase 3 closer to December. Thank you for your interest! We look forward to serving you. #worththewait


CrowdFiber Campaign - Customer Admin

9:15AM September 17, 2020

Bryce Dixon

Looking forward to connection here on Greenbriar Road. Are there pros and cons, like cost, performance and support, of using the supplied modem vs. one I purchase for myself? Thanks.


CrowdFiber Campaign - Customer Admin

11:18AM September 21, 2020

MLConnect Customer Cares Team

In service to our members, MLConnect has researched different modems and supplies free of charge the one we feel provides optimum speed and service with our network. There is no purchase price or rental fee for the modem with our service - only the monthly subscriber fee associated with the plan you choose.


CrowdFiber Campaign - Customer Admin

12:38PM September 15, 2020

Katie Kimbro

Are there any updates on ER-01-3542? We have seen MLEC contractors all over our road, but have called the local office to get a more specific date and constantly getting a busy signal when calling.


CrowdFiber Campaign - Customer Admin

11:15AM September 21, 2020

MLConnect Customer Cares Team

We apologize for the busy signal, as offices are fielding lots of exciting inquiries for service. Our goal was to have this section ready for installations to begin in September; however, it may be delayed slightly as we work to ensure a quality connection and speed. Because you have registered with us online, an MLConnect representative will reach out to you when it is time to process your order. Stay tuned! #WorthTheWait


CrowdFiber Campaign - Customer Admin

8:25AM September 09, 2020

Linda Watts

when will we be connected in TR-01-3342


CrowdFiber Campaign - Customer Admin

1:41PM September 11, 2020

MLConnect Customer Cares Team

MLConnect's plan is to finish construction in Houston County by the end of this year. Installations begin in an area as construction for sections is finished. Variables like weather and COVID-19 can impact our timeline so we provide this as an estimate only. Thank you for your interest and support!


CrowdFiber Campaign - Customer Admin

4:07PM September 03, 2020

jeremie Franklin

when will you be ready in ME-02-2743


CrowdFiber Campaign - Customer Admin

4:29PM September 04, 2020

MLConnect Customer Cares Team

Our goal is to be ready for installations to begin by the end of this year. As shared with others, weather, COVID-19 and other factors can impact our timeline so we provide this as an estimate only. Stay tuned!


CrowdFiber Campaign - Customer Admin

7:34PM August 28, 2020

Justin Summers

When will Lyles tn start getting internet I live on primm springs road


CrowdFiber Campaign - Customer Admin

4:30PM September 04, 2020

MLConnect Customer Cares Team

Hickman County areas are part of Phase 4. We anticipate construction will begin in October 2021 and complete by the the end of 2022. Thank you for your interest. #worththewait


CrowdFiber Campaign - Customer Admin

1:28PM August 28, 2020

Robert Connors

Hello ... Wondering when service to 08-364 Summertown Hwy 157 Oakridge Rd is expected. There is a local company that just received a grant to run fiber in our area but possibly not to my address . Their price is 1.5 times what yours is . They plan to start service in 2021. Thank you


CrowdFiber Campaign - Customer Admin

4:37PM September 04, 2020

MLConnect Customer Cares Team

Lewis County will be part of Phase 3. Construction is scheduled to begin for Phase 3 in December with installations starting in April. We'll be able to provide estimated timelines for the 29 sections of Phase 3 closer to December. Thank you for your interest! We look forward to serving you. #worththewait


CrowdFiber Campaign - Customer Admin

10:23AM August 26, 2020

Terrell Lindsey

When will service be available for the 08-344 area or Switzerland Road in Lewis County?


CrowdFiber Campaign - Customer Admin

5:50PM August 26, 2020

MLConnect Customer Cares Team

Lewis County is in Phase 3 of our project, and construction is scheduled to begin in Perry County this December. Weather, COVID-19, and other variables could change our timeline, but that is our plan at this time. As the construction date approaches, we'll be able to share more about estimated in-service dates for specific areas. Stay tuned. #WorthTheWait


CrowdFiber Campaign - Customer Admin

1:19PM August 12, 2020

Bernadette Nance

526 Kaley Ln. , Erin Tn Over a month ago, we were told that they would be putting up new poles. They have been spray painted "OK". And there has been no movement or work that I can tell has been done in almost 2 months. We have been very patient, as we signed up for service over 1 year ago. Can anyone contact me or let me know what is going on? Thank you.


CrowdFiber Campaign - Customer Admin

5:35AM August 11, 2020

Terry Barnes

A few quick questions if I may. Firstly , what is the hoped for time frame on service in the ER-01-3542 region ? Second what Make and Model of Router are you using or intending for us to use please ? Finally , will we have the option now, or in the future to supply a Router of our choosing ? This is not critically important in the grand scheme of things , but is something that would interest me if it is , or becomes , a option. Thank You , Respectfully , Terry Barnes


CrowdFiber Campaign - Customer Admin

12:58PM August 19, 2020

MLConnect Customer Cares Team

Great questions! MLConnect estimates that installations will begin in your area during the September-October timeframe. Weather, COVID-19 or other variables may impact our timeline, but this is our goal. With your router questions, there is the opportunity for you to supply your own equipment. This option and the MLConnect equipment can be discussed one-on-one when discussing service to your location during the sign-up period. If you have registered interest with us online, an MLConnect representative will reach out to you at that time to provide the most current, accurate details. Take care!


CrowdFiber Campaign - Customer Admin

11:09PM August 06, 2020

James Scarlott

any time frame for 10-334 Nunnelly/Pinewood ? Thanks


CrowdFiber Campaign - Customer Admin

1:43PM August 07, 2020

MLConnect Customer Cares Team

MLConnect is only in and around the city of Centerville in Hickman County at this time. Look for a timeline announcement in the next few weeks. Thank you for your interest.


CrowdFiber Campaign - Customer Admin

4:00PM August 06, 2020

Michelle Neal

Any idea when installations will begin Hurricane Creek Rd in Stewart, TN


CrowdFiber Campaign - Customer Admin

1:44PM August 07, 2020

MLConnect Customer Cares Team

This is in Phase 2, and construction is on schedule to complete in January 2021. For a more specific timeline for your individual address, check with your local MLEC office. #connectwithus


CrowdFiber Campaign - Customer Admin

11:30AM August 06, 2020

Scott Meier

Please give a update when 08-354 Linden Hwy will be started?


CrowdFiber Campaign - Customer Admin

1:51PM August 07, 2020

MLConnect Customer Cares Team

We're putting the finishing touches on our Phase 3 announcement now. Watch our social media platforms and website for something in the next few weeks. If you haven't already, please be sure and register your interest with us online.


CrowdFiber Campaign - Customer Admin

12:40AM August 05, 2020

Cheryl Adler

any update on when 10-324 Totty's Bend will be getting your intent


CrowdFiber Campaign - Customer Admin

1:52PM August 07, 2020

MLConnect Customer Cares Team

MLConnect is only in and around the city of Centerville in Hickman County at this time. Look for a timeline announcement in the next few weeks. Register your interest with us online if you haven't already, and we'll contact you when sign-ups begin in your area. Thank you for your support!


CrowdFiber Campaign - Customer Admin

12:59PM August 04, 2020

Tim Stusse

Any information on the project surrounding the Briarwood Apts area? Recently heard from my apartment manager that a green light was given.


CrowdFiber Campaign - Customer Admin

1:53PM August 07, 2020

MLConnect Customer Cares Team

Contact your local MLEC office for the latest update. Thank you for your support and interest.


CrowdFiber Campaign - Customer Admin

11:14AM August 01, 2020

Todd Murphy

Any update for service availability for Mason's Boat Dock area at Clydeton Road? Thanks


CrowdFiber Campaign - Customer Admin

1:55PM August 07, 2020

MLConnect Customer Cares Team

Contact your local MLEC office for the latest update for your specific address. Thank you for your support and interest.


CrowdFiber Campaign - Customer Admin

10:52AM July 24, 2020

Penelope Baker

Any update on the timeframe for 07-344 Cedar Creek out on Swindle Creek at Cedar Creek? Anxiously awaiting the opportunity to join you for phone and broadband as well as electric! :) Thanks!


CrowdFiber Campaign - Customer Admin

1:54PM August 07, 2020

MLConnect Customer Cares Team

Thank you for the support. We're putting the finishing touches on our Phase 3 announcement now. Watch our social media platforms and website for something in the next few weeks. If you haven't already, please be sure and register your interest with us online.


CrowdFiber Campaign - Customer Admin

5:28PM July 23, 2020

Karen Rist

I have 2 questions; First, I am located in Houston County ER-01-3541 , any new idea on when you will be in my area? Second, For those of us who do not answer the phone to numbers we do not recognize is it possible to give us a phone number that you would be calling from when you need to contact us? Thank you in advance for your response and for being out there working during this troubling time. Please Stay Safe and Stay Healthy.


CrowdFiber Campaign - Customer Admin

2:00PM August 07, 2020

MLConnect Customer Cares Team

Hi there! Our goal is to begin installations for this area in September. Weather, COVID and other factors could move the timeline, but we're going strong. On the phone number, we have multiple representatives calling, so it would not be possible to supply one number. If you prefer to be contacted via email, let us know. Or, make sure that your voicemail is enabled, and we will glady leave a lmessage. #Connectwithus


CrowdFiber Campaign - Customer Admin

11:02AM July 22, 2020

Brent Jones

Any idea when you'll make it to Ayres Dr. in Linden? Thanks,


CrowdFiber Campaign - Customer Admin

1:54PM August 07, 2020

MLConnect Customer Cares Team

We're putting the finishing touches on our Phase 3 announcement now. Watch our social media platforms and website for something in the next few weeks. If you haven't already, please be sure and register your interest with us online.


CrowdFiber Campaign - Customer Admin

10:40AM July 21, 2020

Michelle Daily

Any time frame on Poplar Grove Road near Dickson county line?


CrowdFiber Campaign - Customer Admin

1:56PM August 07, 2020

MLConnect Customer Cares Team

Contact your local MLEC office for the latest update for your specific address. Thank you for your support and interest.


CrowdFiber Campaign - Customer Admin

10:03AM July 21, 2020

jessica ethridge

Any updates on when installations will start for Lawson road in Hohenwald?


CrowdFiber Campaign - Customer Admin

1:55PM August 07, 2020

MLConnect Customer Cares Team

We're putting the finishing touches on our Phase 3 announcement now. Watch our social media platforms and website for something in the next few weeks. If you haven't already, please be sure and register your interest with us online.


CrowdFiber Campaign - Customer Admin

9:52PM July 13, 2020

Christopher Mercer

Any update on a potential time frame for the 08-344 Buffalo Rd/Waynesboro Hwy area?


CrowdFiber Campaign - Customer Admin

12:04PM July 14, 2020

MLConnect Customer Cares Team

Hi there! We are currently looking at our remaining areas and are in the design stage for our next steps. Look for an update to be available soon!


CrowdFiber Campaign - Customer Admin

12:48PM July 13, 2020

Jimmy Patterson

Is there any update on when to expect the internet to be on Big Richland Rd?


CrowdFiber Campaign - Customer Admin

12:07PM July 14, 2020

MLConnect Customer Cares Team

Thank you for your interest! Our goal is to begin installations in this area during the October-December timeframe.


CrowdFiber Campaign - Customer Admin

9:43PM July 10, 2020

Stanley Carter

Approximately when will you have service pn Presley Hill lane in Erin?


CrowdFiber Campaign - Customer Admin

12:09PM July 14, 2020

MLConnect Customer Cares Team

Hi there! We estimate in-home/business installations will begin in this area during the September-October timeframe. We look forward to serving you!


CrowdFiber Campaign - Customer Admin

5:55PM July 06, 2020

Pete Schofield

When will service be available Waverly Rd, Tennessee Ridge?


CrowdFiber Campaign - Customer Admin

12:11PM July 14, 2020

MLConnect Customer Cares Team

Our hope is to be ready for installations in September; however, weather, COVID-19 and other variables may change our timeline. For now, we're pressing on!


CrowdFiber Campaign - Customer Admin

2:18PM July 06, 2020

Steve Brady

Hello, we have around 100 personal accounts and 10-15 business accounts on The Farm Community that could represent quite a bit of revenue for MLConnect. There is a larger community in the area that would also benefit from having access to broad band. I was told that they should be making a timeline announcement about Phase 3 soon, can you let us know when this might happen? I am a Sr. Systems Engineer and have a house on the community, but can't live there because the internet service is so poor. I have been renting apartments in other towns for about 10 years and it would be great to be able to move back home. There are a number of other people in this same predicament and also others wanting to start online businesses, but are inhibited by poor internet service. Any information would be greatly appreciated.


CrowdFiber Campaign - Customer Admin

12:14PM July 14, 2020

MLConnect Customer Cares Team

Thank you for the information and your interest. We hope to make the announcement in the next few weeks, after we finish design and planning. Stay tuned!


CrowdFiber Campaign - Customer Admin

6:50PM July 05, 2020

Dayton Ronewicz

Any idea if you guys service the Lobelville Village Apartments? Any answer will be appreciated


CrowdFiber Campaign - Customer Admin

12:13PM July 14, 2020

MLConnect Customer Cares Team

Hi there! Apartment complex installations are all unique and have different requirements for design. Before starting, we need a percentage of registrations. Thank you for working with us to spread the word.


CrowdFiber Campaign - Customer Admin

1:14PM July 04, 2020

Michelle Puckett

What do the colors on the service area map represent? M. Puckett


CrowdFiber Campaign - Customer Admin

12:17PM July 14, 2020

MLConnect Customer Cares Team

Thank you for checking with us. The map section is constantly being updated due to construction. We are working to create a simple summary of the information and hope to serve everyone better in the future. In the meantime, we welcome any individual inquiries to your local office or to customercare@mlconnect.com to keep the lines of communication open. Take care!


CrowdFiber Campaign - Customer Admin

8:46PM June 30, 2020

James Scarlott

would it be possible to order the business Lite at a residential Location not a business ?


CrowdFiber Campaign - Customer Admin

10:12AM July 01, 2020

MLConnect Customer Cares Team

MLConnect has many options, and we will work with you to deliver the service you need. When we are ready to serve your area, you can share your needs with the MLConnect representative who will assist you.


CrowdFiber Campaign - Customer Admin

12:01PM June 29, 2020

Kathy Arnold

Any idea of when you'll have the service on W. Little Richland Rd.? We have a very sketchy service at the moment and are excited to think we'll get something we can depend on!


CrowdFiber Campaign - Customer Admin

10:15AM July 01, 2020

MLConnect Customer Cares Team

Our goal for service to this area is in the October-December timeframe. Thank you for registering with us online. When installations begin in your area, and MLConnect representative will reach out to you.


CrowdFiber Campaign - Customer Admin

7:49PM June 24, 2020

Kyle Hudgins

I was wondering when MLConnect would be available down Grinders Creek Rd and up to Pleasant Drive off of Grinders Creek Rd?


CrowdFiber Campaign - Customer Admin

10:18AM July 01, 2020

MLConnect Customer Cares Team

Phases 3 and 4 are currently in the design stage. We will make a timeline update when information is available. Thank you for your patience.


CrowdFiber Campaign - Customer Admin

11:23AM June 24, 2020

Wayland Brooks

The ML contractors recently stretched the wire in the white oak/Magnolia bridge area of Houston County, however, they apparently missed my house at 500 Wilson Cemetery Lane, while all the other houses in the area have the wire and the coiled drops. Is this planned, or have I been forgotten?


CrowdFiber Campaign - Customer Admin

10:22AM July 01, 2020

MLConnect Customer Cares Team

Thank you for your interest. Our target for serving your address is in the October-December timeframe. Like electric service, construction to serve an area is often unseen in the immediate location. Different areas are fed from different lines. We appreciate your patience.


CrowdFiber Campaign - Customer Admin

7:59AM June 24, 2020

Kim Lewis

What is the time frame for Clydeton Road and service areas off it? We've seen a lot of progress in other areas but nothing going on here. Was originally told it would be March-April of this year.


CrowdFiber Campaign - Customer Admin

10:25AM July 01, 2020

MLConnect Customer Cares Team

The fiber lines to serve different areas are fed from different locations. You can contact your local MLEC office with your address, and they can supply the latest update for you. Thank you for your patience and support!


CrowdFiber Campaign - Customer Admin

1:00PM June 19, 2020

Jared Black

Could you explain what each color means in the map? I’m sure that would be a huge help to a lot of people.


CrowdFiber Campaign - Customer Admin

10:17AM June 23, 2020

MLConnect Customer Cares Team

Thank you for sharing your comment. The map section is constantly being updated due to construction. We are working to create a simple summary of the information and hope to serve everyone better in the future. In the meantime, we welcome any individual inquiries to keep the lines of communication open. Take care!


CrowdFiber Campaign - Customer Admin

1:36PM June 15, 2020

Shawna Hicks

I live on 231 in McEwen, I pick up MLConnect from my neighbors, can you tell me when it will be available to me?


CrowdFiber Campaign - Customer Admin

5:16PM June 15, 2020

MLConnect Customer Cares Team

Installations will begin in your area very soon. Since you've registered with us online, an MLConnect representative will reach out to you. Or, you can visit your local MLEC office to sign a Participation Agreement.


CrowdFiber Campaign - Customer Admin

5:01PM June 14, 2020

Bryce Dixon

Since I see no comments about Greenbriar Road, and since we are at the northwest corner of the county only one house away from Houston County, I wonder when broadband will make it to our remote location? Thanks.


CrowdFiber Campaign - Customer Admin

5:17PM June 15, 2020

MLConnect Customer Cares Team

The estimated time for installations to begin in your area is the October-December timeframe. We look forward to serving you.


CrowdFiber Campaign - Customer Admin

6:20AM June 11, 2020

Melissa Becker

Over a month ago crews were out (even took a wrong turn and drove into our woods) and installed at our neighbors but haven't been back for us! Any idea when they will be back? There isnt a map key but from what I can tell we are on the map.


CrowdFiber Campaign - Customer Admin

11:05AM June 11, 2020

MLConnect Customer Cares Team

Thank you for checking with us and this information. Like electric service, different areas are "fed" from different locations following a specific path for reliability, cost, etc. Construction is ongoing and installations for your specific area are estimated to begin in September. Weather and other variables could impact this, but we are on target at this time.


CrowdFiber Campaign - Customer Admin

9:21AM June 09, 2020

Sabrina Nelson

I have seen some of the comments on here about Bold Springs being October/December 2020 to start. I live on Hurricane Creek Road McEwen Side. Seen one of your maintenance guys yesterday working on a house on our road on Waverly side, help him direct traffic because he was on a hill, but he thought you all were doing connect all the houses that were registered to be connected on our road. We explained we were on McEwen side he was confused. Was wanting to see when we might see internet?


CrowdFiber Campaign - Customer Admin

4:38PM June 10, 2020

MLConnect Customer Cares Team

Thank you for assisting the contractors. It is great to live in our rural hometowns. Also, thank you for checking with us about service. Building the broadband network is an intricate project, and like electric service, different areas are "fed" from different locations following a specific path for reliability, cost, etc. Installations for your specific area are estimated to begin in the October/December 2020 timeframe. Weather and other variables could impact this, but we are on target at this time. Again, thank you for the assistance, the questions and this opportunity to share information.


CrowdFiber Campaign - Customer Admin

1:44AM June 09, 2020

James Scarlott

having a service area map is great, but one of the reasons you have so many questions posted here is there is no key to go with the map so we could look and see for ourselves.


CrowdFiber Campaign - Customer Admin

4:40PM June 10, 2020

MLConnect Customer Cares Team

Thank you for sharing your comment. The map section of this website is constantly being updated due to construction. We are working to create a simple summary of the information and hope to serve everyone better in the future. In the meantime, we welcome any individual inquiries to keep the lines of communication open. Take care!


CrowdFiber Campaign - Customer Admin

12:08PM June 06, 2020

Randy Bowen

Hopefully this service comes soon to the Farm Community where there are at least 100 or more customers waiting patiently!


CrowdFiber Campaign - Customer Admin

4:42PM June 10, 2020

MLConnect Customer Cares Team

We appreciate everyone's excitement and support and are looking forward to serving all our members in time. ​For Lewis County, we are currently doing installations for some areas of Hohenwald. While your location is not eligible at this time, MLEC/MLConnect is committed to making broadband an option for ALL MLEC members. Our goal is to complete construction by the end of 2022, but considering the amount of interest, it will take longer to reach all the in-home and in-business actual installations. Because you have registered with us online, we will reach out to you when installations begin in your area. Look for a timeframe update for Lewis County soon. We appreciate your patience and support as we work to serve everyone.


CrowdFiber Campaign - Customer Admin

11:29AM June 02, 2020

Wendy Brink

Yes curious when the McEwen end of white oak ridge will be able to get it in the house ? I was all excited when we saw them running wires on the poles😊


CrowdFiber Campaign - Customer Admin

4:44PM June 10, 2020

MLConnect Customer Cares Team

Great news! Your area is going live very soon (possibly in the next few weeks)! Because you've registered with us online, an MLConnect representative will be in touch to discuss the sign-up process, or you can visit your local MLEC office. Thank you for your interest in MLConnect. We know you'll love it! ​


CrowdFiber Campaign - Customer Admin

9:50AM June 02, 2020

Judith Zoglio

Hey any idea on 2270 Hwy 50 E. I think we are in little lot. Anyway I have husband at home with leukemia, that now has Neutropenia from his chemo pill and this pandemic has ground our lives to a halt. I need to seek work at home opportunities and am waiting for this internet service in order to do this. Any ideas on eta for our area?


CrowdFiber Campaign - Customer Admin

4:51PM June 10, 2020

MLConnect Customer Cares Team

Thank you for sharing with us. Our goal is to complete construction by the end of 2022, and we will be making a timeline update soon. On a more personal note, we are sorry for what your family is currently going through.


CrowdFiber Campaign - Customer Admin

9:50AM June 02, 2020

James Puglisi

Still waiting for service!!!!!


CrowdFiber Campaign - Customer Admin

4:46PM June 10, 2020

MLConnect Customer Cares Team

Thank you for being patient as we work to make affordable, reliable, super-fast broadband an option for all of MLEC's five-county service area. We hope to make a timeline update soon!


CrowdFiber Campaign - Customer Admin

7:56AM May 29, 2020

Benji Cole

10-314 Brown Hollow is gray on the map. does that mean it is projected to have service and the green sections already have service? If that is correct is there a projected date for 10-314 Brown Hollow?


CrowdFiber Campaign - Customer Admin

11:49AM May 29, 2020

MLConnect Customer Cares Team

Thank you for checking with us. Brown Hollow Road in Hickman County will be in a later phase, and we plan to make a timeline update announcement soon.


CrowdFiber Campaign - Customer Admin

9:28PM May 28, 2020

audrey tuberville

When will be down 731 Waverly' rd, in the ridge


CrowdFiber Campaign - Customer Admin

11:54AM May 29, 2020

MLConnect Customer Cares Team

Construction is underway and we hope to begin installations in the area around September.


CrowdFiber Campaign - Customer Admin

2:47PM May 28, 2020

Gretchen Bates

Do you know when you'll bring service to Walker Rd., in Summertown? Also, I spoke to a MLEC representative that suggested I write a letter telling why we so desperately need internet in my area. Can you tell me where to send a letter? Thank you!


CrowdFiber Campaign - Customer Admin

11:56AM May 29, 2020

MLConnect Customer Cares Team

Thank you for your interest and support. We will making a timeline announcement about the remaining areas of Hickman, Lewis and Perry counties soon. We always appreciate hearing from those we serve, so you can send letters to your local MLEC office.


CrowdFiber Campaign - Customer Admin

2:18PM May 28, 2020

Tammy Anglin

When will service be available on Henderson Road in Hohenwald TN


CrowdFiber Campaign - Customer Admin

12:00PM May 29, 2020

MLConnect Customer Cares Team

We're excited to be making progress on Phase II and will be sharing an update about Lewis County soon.


CrowdFiber Campaign - Customer Admin

4:38PM May 26, 2020

Joey Hornick

Why do my comments not post? See contractors on Old Nahville Hwy in McEwen, when can we expect service in Old Nashville Hwy/Schrock Road/White Oak/Tom Brown Road area?


CrowdFiber Campaign - Customer Admin

12:12PM May 29, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us! We're sorry for any confusion about the comments. They go through a process before going live. The goal is to begin installations in your area within the next month! Since you've registered with us online, an MLConnect representative will be in touch.


CrowdFiber Campaign - Customer Admin

9:35AM May 26, 2020

Joey Hornick

Seeing main line hookups by contractors so when can we expect installation in Old Nashville Hwy/White Oak/Tom Brown Road area?


CrowdFiber Campaign - Customer Admin

12:13PM May 29, 2020

MLConnect Customer Cares Team

We'll be in your area soon! If you have not already, you can contact your local MLEC to begin the sign-up paperwork.


CrowdFiber Campaign - Customer Admin

6:36PM May 25, 2020

cory gibbons

Is there any timeframe for waynesboro hwy/ reeves rd will see fiber?


CrowdFiber Campaign - Customer Admin

12:14PM May 29, 2020

MLConnect Customer Cares Team

Thank you for supporting MLConnect! We look forward to making broadband and phone an option to all MLEC members. Look for a timeline announcement for your county soon!


CrowdFiber Campaign - Customer Admin

8:22AM May 24, 2020

Joey Hornick

Any update on service in service area ME-02-2746, Old Nashville Hwy/White Oak/Tom Brown Road area?


CrowdFiber Campaign - Customer Admin

12:15PM May 29, 2020

MLConnect Customer Cares Team

It won't be long!


CrowdFiber Campaign - Customer Admin

12:25PM May 22, 2020

Jesse James

What schedule is Baptist Branch Road on for MLConnect service ?


CrowdFiber Campaign - Customer Admin

12:17PM May 29, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us. Construction is ongoing, and we hope to begin installations in your area later this year.


CrowdFiber Campaign - Customer Admin

10:23AM May 21, 2020

Pat Hodges

When will service be available on Ridge Road in McEwen?


CrowdFiber Campaign - Customer Admin

12:19PM May 29, 2020

MLConnect Customer Cares Team

We are on target to begin installations in the October-December timeframe. Weather and other varibles could create delays, but we encourage you to check for updates.


CrowdFiber Campaign - Customer Admin

5:23PM May 20, 2020

Kelly Simms-Price

Just curious about Old Stage Rd in McEwen?


CrowdFiber Campaign - Customer Admin

12:20PM May 29, 2020

MLConnect Customer Cares Team

We estimate installations could begin in this area in the next few months!


CrowdFiber Campaign - Customer Admin

11:31AM May 19, 2020

Tina Coffelt

When will service be available on old 49 hwy in Érin tn


CrowdFiber Campaign - Customer Admin

8:48AM May 20, 2020

MLConnect Customer Cares Team

Hi there! This areas is under construction, and we estimate installations could begin in the July-September 2020 timeframe. Thank you for registering your interest with us online. When we start services in your area, an MLConnect representative will reach out to helpl you sign up.


CrowdFiber Campaign - Customer Admin

4:40PM May 14, 2020

MLConnect Customer Cares Team
Admin

We received an inquiry about 2375 Bold Springs Road in McEwen. The original comments was lost; however, we wanted to share an update. This area is on target for installations to begin in the October-December 2020 timeframe.


CrowdFiber Campaign - Customer Admin

9:39AM May 14, 2020

Lisa Winkler

Is there any time frame for the Coble area, and every time I try to put my address in it gives me an error.


CrowdFiber Campaign - Customer Admin

4:44PM May 14, 2020

MLConnect Customer Cares Team

Please contact your local MLEC office for assistance with registering.


CrowdFiber Campaign - Customer Admin

8:12AM May 14, 2020

Jo Atkinson

Hi, when do you plan on installing MLConect at 224 Brushy Road? We are ready to sign up!!!! Thanks, Jo


CrowdFiber Campaign - Customer Admin

4:45PM May 14, 2020

MLConnect Customer Cares Team

Hi there! We hope to make a timeline announcement for Hickman, Lewis and Perry counties soon.


CrowdFiber Campaign - Customer Admin

3:51PM May 13, 2020

sherrill sanchez

I live on Whitten Hollow Rd. Thought I'd be installed with Lobelville and "surrounding area". But that didn't seem to happen. Where are we now on the schedule? Thanks


CrowdFiber Campaign - Customer Admin

4:52PM May 14, 2020

MLConnect Customer Cares Team

Thank you for asking and your interest in MLConnect! We will be making an update announcement soon for the remaining areas. Stay tuned!


CrowdFiber Campaign - Customer Admin

3:51AM May 12, 2020

Simon Devers

Just wondering on any updates for service to Bradley Rd n McEwen? Thanks


CrowdFiber Campaign - Customer Admin

4:55PM May 14, 2020

MLConnect Customer Cares Team

Our plan is to begin installations in this area in the June-July timeframe. Since you have registered with us online, an MLConnect representative will reach out to you.


CrowdFiber Campaign - Customer Admin

10:02AM May 11, 2020

Donald Nallinger

What's the estimated time for installation and set up in McEwen for 40 Magnolia Ave, was told 2 month wait for an area that's ready for installation. Seems long for a line to be ran to the house when all the neighbors already have it. Thanks you.


CrowdFiber Campaign - Customer Admin

4:59PM May 14, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us. For personal assistance, please contact your local MLEC office 931.296.2581 for an update.


CrowdFiber Campaign - Customer Admin

9:14AM May 08, 2020

Chris Ragsdale

What is the estimated time frame for Ben Fly Road in Lyles. Brown Hollow area


CrowdFiber Campaign - Customer Admin

11:11PM May 24, 2020

Victoria Gordon

We are in the same area. So ready!


CrowdFiber Campaign - Customer Admin

4:46PM May 14, 2020

MLConnect Customer Cares Team

Thank you for your interest! Our plan is to update everyone with a potential timeline for the remaining areas of Hickman County soon.


CrowdFiber Campaign - Customer Admin

7:36AM May 07, 2020

Vernon Hamman

Hi, you all have been very busy in my area Half pone Rd putting up fiber is there an estimated time for installations to begin?


CrowdFiber Campaign - Customer Admin

5:04PM May 14, 2020

MLConnect Customer Cares Team

Construction has several steps, and we're making progress. We estimate installations could begin in your area in the July-September timeframe. We look forward to serving you!


CrowdFiber Campaign - Customer Admin

12:20PM May 06, 2020

Brandon Moxley

Any updates on service area WA 11-3644 ? Especially 13S near Buffalo?


CrowdFiber Campaign - Customer Admin

5:07PM May 14, 2020

MLConnect Customer Cares Team

Please contact us at 931.296.2581 for an update for your specific location. We look forward to serving you!


CrowdFiber Campaign - Customer Admin

2:19PM May 05, 2020

robby finerty

Any idea if or when service will be available for The Farm community?


CrowdFiber Campaign - Customer Admin

4:47PM May 14, 2020

MLConnect Customer Cares Team

Thank you for your interest in broadband for Lewis County! We are in the design stage of Phases III and IV and will be sharing a progress report soon.


CrowdFiber Campaign - Customer Admin

12:55PM May 05, 2020

emmanuel williams

i live on marsh creek rd. in Linden, behind to co-op. what is the estimated time frame for installation on marsh creek rd. ?


CrowdFiber Campaign - Customer Admin

5:26PM May 14, 2020

MLConnect Customer Cares Team

We are designing Phases III and IV and will be making an update soon. Thank you for your interest in connecting with MLConnect!


CrowdFiber Campaign - Customer Admin

11:43AM May 05, 2020

ZACHERY ROBERSON

When is the estimated completion time of phase 2 on sr49 Erin TN?


CrowdFiber Campaign - Customer Admin

5:27PM May 14, 2020

MLConnect Customer Cares Team

We look forward to serving your area and estimate installations will begin in the July-September timeframe.


CrowdFiber Campaign - Customer Admin

9:50AM May 05, 2020

Matthew brown

can you provide an update for North Hurricane Creek Road. , i know they have run the lines, just wondering when they will go live


CrowdFiber Campaign - Customer Admin

5:29PM May 14, 2020

MLConnect Customer Cares Team

Contact your local MLEC office for the latest news on installations coming to your area - SOON!


CrowdFiber Campaign - Customer Admin

8:10AM May 04, 2020

Cody McGee

I see that Hwy 13 N/Buffalo is considered Phase 2 per the service area map. What is the estimated timeline for bringing services to Highway 13 North on the Humphreys/Perry county line?


CrowdFiber Campaign - Customer Admin

5:30PM May 14, 2020

MLConnect Customer Cares Team

Your location is part of our Perry County design. We will be making announcement about new areas soon.


CrowdFiber Campaign - Customer Admin

3:36PM May 03, 2020

Cody McGee

What is the estimated timeline for bringing service to Highway 13 North/South on the Humphreys/Perry county line?


CrowdFiber Campaign - Customer Admin

5:31PM May 14, 2020

MLConnect Customer Cares Team

Thank you for your interest in MLConnect! We'll be making an update announcement soon.


CrowdFiber Campaign - Customer Admin

9:26AM May 02, 2020

Sam Severn

Hello! When do you expect to have high speed internet in the Nunnelly area (Boyce Road near the Piney River)?


CrowdFiber Campaign - Customer Admin

4:46PM May 14, 2020

MLConnect Customer Cares Team

Our goal is to complete construction for all areas by the end of 2022. We will be making a update announcement soon!


CrowdFiber Campaign - Customer Admin

9:51AM May 01, 2020

Brandon Moxley

Any update on area WA 11-3644?


CrowdFiber Campaign - Customer Admin

5:09PM May 14, 2020

MLConnect Customer Cares Team

We're almost ready! Contact your local MLEC office for an update about your specific location.


CrowdFiber Campaign - Customer Admin

9:43AM May 01, 2020

Brandon Moxley

Do you have a status update for Whispering Creeks Lane, Hurricane Mills? 2.5 miles north of the interstate on Hwy 13 S?


CrowdFiber Campaign - Customer Admin

5:32PM May 14, 2020

MLConnect Customer Cares Team

Thank you for your interest in MLConnect! Check your local MLEC office for the latest on your location.


CrowdFiber Campaign - Customer Admin

1:22PM April 29, 2020

Kim Lewis

What is the estimated timeline for installation on W. Big Richland Road?


CrowdFiber Campaign - Customer Admin

10:33AM April 30, 2020

MLConnect Customer Cares Team

Hi there! Our goal to begin installaton for this area in Q4 of this year.


CrowdFiber Campaign - Customer Admin

4:07PM April 25, 2020

Beverly Mehrlich

Seems that pole has been added to our property at the corner of Poplar Grove and Baptist Branch. Any idea when we'll have service.? Thank you. Can't wait until we're live!


CrowdFiber Campaign - Customer Admin

10:11AM April 30, 2020

MLConnect Customer Cares Team

Thank you for checking in with MLConnect. We anticipate that installations will begin in this area by the end of this year.


CrowdFiber Campaign - Customer Admin

9:17AM April 24, 2020

John Dampf

can i get approx service start dates for the following addresses 2200 E Little Richland Road, Waverly 531 Bullington Road, McEwen


CrowdFiber Campaign - Customer Admin

10:13AM April 30, 2020

MLConnect Customer Cares Team

Hi there! The Bullington Road area could start with installations as early as June. For East Little Richland, we expect to start installations by the end of the year.


CrowdFiber Campaign - Customer Admin

7:43PM April 23, 2020

Melinda Billings

Could you also give me an update on when installations may begin in our area. I see fiber being run on all sides of us but missing our address by a 1/4 mile in all directions. BTW you have been very good at answering everyones questions. Thank you.


CrowdFiber Campaign - Customer Admin

10:15AM April 30, 2020

MLConnect Customer Cares Team

Thank you! We appreciate all the inquiries and support for MLConnect. Open communication is key to service. Based on your MLConnect online registration, we anticipate beginning installations in the October-December timeframe.


CrowdFiber Campaign - Customer Admin

3:19PM April 23, 2020

Melissa Curtis

What does Q2 or Q3 mean?


CrowdFiber Campaign - Customer Admin

10:16AM April 30, 2020

MLConnect Customer Cares Team

Great question! We are referring to the quarter of the year. For example, Q2 is the April-June timeframe, and Q3 would be July-September. Take care!


CrowdFiber Campaign - Customer Admin

2:03PM April 23, 2020

Norma Pena

I live in New Johnsonville and am wanting to set up an installation asap. When will I be able to schedule?


CrowdFiber Campaign - Customer Admin

10:17AM April 30, 2020

MLConnect Customer Cares Team

Your area is accepting installations. Contact your local MLEC office for personal assistance.


CrowdFiber Campaign - Customer Admin

10:22AM April 22, 2020

Jean Donnelly

The lines were installed in "Tall Trees" a few months ago. Are we live yet, or is there a set date?


CrowdFiber Campaign - Customer Admin

10:18AM April 30, 2020

MLConnect Customer Cares Team

Depending on the address, your location could be open for installations now. Please contact your local MLEC office for the most updated information.


CrowdFiber Campaign - Customer Admin

1:47PM April 21, 2020

sherrill sanchez

I thought I was included in the Lobelville service area that was installed last summer, but that didn't happen.. I see in the newspaper that Perry County received another 600K grant. It said it was designated for the southern part of the county. Will I ever get broadband? It is needed for business activities as well as residential. I live off Lost Creek Rd.


CrowdFiber Campaign - Customer Admin

10:19AM April 30, 2020

MLConnect Customer Cares Team

Thank you for the inquiry. We are currently designing Phases III and IV (Hickman, Lewis and Perry counties) and hope to make a timeframe announcement soon. Stay tuned!


CrowdFiber Campaign - Customer Admin

8:22AM April 21, 2020

Tamara Hoffa

Any updates for service installation on CCC Road in McEwen?


CrowdFiber Campaign - Customer Admin

10:20AM April 30, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us! We hope to begin installations in this area in June. We look forward to serving you!


CrowdFiber Campaign - Customer Admin

7:24PM April 19, 2020

Pete Schofield

Fiber was recently run to the pole on my property. How long will it be before I can get service at my residence?


CrowdFiber Campaign - Customer Admin

4:12PM April 20, 2020

MLConnect Customer Cares Team

Thank you for your interest. Your location looks to be in Area 28 of Phase II. Our goal is to begin installations in Q3 of 2020.


CrowdFiber Campaign - Customer Admin

5:34PM April 17, 2020

Larry Sanders

When will we have service on Cedar Grove Rd in Hurricane Mills?


CrowdFiber Campaign - Customer Admin

4:14PM April 20, 2020

MLConnect Customer Cares Team

Thank you for your interest. Your location looks to be in Area 60 of Phase II. Our goal is to begin installations in Q4 of 2020.


CrowdFiber Campaign - Customer Admin

7:34PM April 16, 2020

Dionicio Lopez

With the new update about the grants southern Perry and Hickman counties had received, does this shift priorities from areas of high support waiting for service to areas that received the grant?


CrowdFiber Campaign - Customer Admin

4:15PM April 20, 2020

MLConnect Customer Cares Team

We are receiving a grant for Perry County; however, the grant application for Hickman County was not funded. At this time, we remain focused on construction of Phase II (Humpreys and Houston counties) and the grant we received for Humphreys County. An annoucement about Phases III and IV (Hickman, Lewis and Perry) will be made soon.


CrowdFiber Campaign - Customer Admin

1:05PM April 15, 2020

RHONDA BRAMLETT

When are they scheduled to put ML connect on Lucas Ridge Lane off of N. Clydeton? They stopped at the vet's office.


CrowdFiber Campaign - Customer Admin

4:17PM April 20, 2020

MLConnect Customer Cares Team

Thank you for your interest. Your location looks to be in Area 55 of Phase II. Our goal is to begin installations in Q4 of 2020.


CrowdFiber Campaign - Customer Admin

12:32PM April 15, 2020

Eric Beard

Any idea how long before you head down hey 49 towards Dickson?


CrowdFiber Campaign - Customer Admin

4:19PM April 20, 2020

MLConnect Customer Cares Team

Thank you for your interest. Your location looks to be in Area 32 of Phase II. Our goal is to begin installations in Q3 of 2020.


CrowdFiber Campaign - Customer Admin

5:01PM April 13, 2020

Josh Kvapil

Any idea on when service may be available on Blue Buck Creek Rd?


CrowdFiber Campaign - Customer Admin

12:18PM April 13, 2020

Robert St Sauver

They ran the fiber to my house about a month ago and we haven’t heard anything else. Could you provide any updates? Thank you.


CrowdFiber Campaign - Customer Admin

3:46PM April 13, 2020

MLConnect Customer Cares Team

Your location looks to be in service and taking installations. An MLConnect representative will be reaching out to you. Or, you can contact your local MLEC office at 931-296-2581. Thank you for your support!


CrowdFiber Campaign - Customer Admin

8:38AM April 13, 2020

Phillip Hicks

Any timeline for our part of the county? It looks like the rough in has been done on the service line. Thank you...


CrowdFiber Campaign - Customer Admin

3:48PM April 13, 2020

MLConnect Customer Cares Team

The address registered with your email address in the MLConnect website puts you in a location where we hope to begin installations next month! Since you've registered with us, an MLConnect representative will contact you when it is time. Thank you for choosing MLConnect!


CrowdFiber Campaign - Customer Admin

8:56AM April 10, 2020

Steven Palk

When will we expect fiber ran down Estero Ln in McEwen? I sometimes have to work at home and having to due to the Covid-19. Viasat just isn't getting it done. I feel for anyone that has to suffer from depending on their internet from a satelite. Thank you.


CrowdFiber Campaign - Customer Admin

3:51PM April 13, 2020

MLConnect Customer Cares Team

We are on target to finish construction to serve this area and begin installations in June. Please register with us by entering your address and answering a few questions on our website www.mlconnect.com. This gives us a way to contact you when installations begin. Stay tuned!


CrowdFiber Campaign - Customer Admin

9:55AM April 06, 2020

Andy Jones

Any update for N. hurricane creek rd?


CrowdFiber Campaign - Customer Admin

11:35AM April 09, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us. We could not find a registration under your email address. Please contact your local MLEC office for personal assistance, or register with us online.


CrowdFiber Campaign - Customer Admin

7:48PM April 01, 2020

Jeffrey McPherson

We are, like many, anxiously waiting for high speed internet connection from MLCONNECT. The fiber connections have been completed on the poles in my area - Little Blue Creek Road. How long before installations will start?


CrowdFiber Campaign - Customer Admin

11:36AM April 09, 2020

MLConnect Customer Cares Team

Great news! The location registered with your email address is on target to receive service next month!


CrowdFiber Campaign - Customer Admin

9:52AM April 01, 2020

Robert Lee Williams

I know that this is a large task to get all these counties connected but the people in the rural areas of these counties are the ones needing this now. The city areas already have high speed internet. Those of us who rely on dish, hughes net, etc. are in dire need of high speed internet., We rely on our internet for business, education, shopping, and numerous other things. Do you have any time frame for my area? Shortly I will be forced to upgrade my hughes net and I was hoping That I would be on mlconnect before I had to do this. Looks like it will be another few years at the rate you are going.


CrowdFiber Campaign - Customer Admin

2:37PM April 01, 2020

MLConnect Customer Cares Team

Thank you for checking with us. We are working as quickly as we can to reach all areas. The reasons you described are why MLEC chose to start this journey. We understand how important broadband internet is to our members. Like building the electric system, we started where equipment was already in place and are building out as we go for the strongest, most reliable system. An announcement for a timeline to include Hickman, Lewis and Perry counties will be available later this year. I can share that our goal remains to finish construction to all five counties by the end of 2022. We appreciate your patience but also understand the dire need.


CrowdFiber Campaign - Customer Admin

10:33AM March 31, 2020

Amanda Johnston

My company has said I can work from home, however I don't have internet. How long before it gets to W. Little Richland Rd, Hemby Branch Rd in Waverly?


CrowdFiber Campaign - Customer Admin

3:23PM April 01, 2020

MLConnect Customer Cares Team

There are 64 design areas in Phase II, and installations begin when construction is finished for that area. Your address looks to be in area 55, which means we hope to begin installations the last quarter of this year. Weather and other variables may change this, but because you are registered with us online, we will reach out to you when installations begin.


CrowdFiber Campaign - Customer Admin

1:43PM March 28, 2020

Linda Brackett

I live up on Old Blacktop in Mcewen any good news this way? I see them working around the area.


CrowdFiber Campaign - Customer Admin

3:25PM April 01, 2020

MLConnect Customer Cares Team

Great news! Our goal is to begin installations in this area by June. Because you have registered with us online, we will contact you when it is time to schedule your installation.


CrowdFiber Campaign - Customer Admin

3:52PM March 27, 2020

James Scarlott

I know my Area Nunnnelly does not yet have a time frame, but I tried to look at your information regarding Phone service, I really want/need to know if an option will be available to block known robocallers, I.E. ones that call my house everyday using the same actual not a spoofed number.


CrowdFiber Campaign - Customer Admin

3:28PM April 01, 2020

MLConnect Customer Cares Team

Thank you for checking with us. Yes! Our phone system does allow you to block unwanted numbers and have a Robo Call block.


CrowdFiber Campaign - Customer Admin

3:47PM March 25, 2020

Melissa Curtis

I know this is a difficult time but being stuck at home during this crisis is harder without internet. My son can’t do his online classes now that they’ve cancel college. We live out Bakerville Road in Waverly Tn. Any good news you can give us????


CrowdFiber Campaign - Customer Admin

8:36AM March 26, 2020

MLConnect Customer Cares Team

We share the good news that while the weather and COVID-19 have been slowing our progress, we are still moving forward. Also, we know that you'll love MLConnect when it reachces you. The goal is to begin construction in your area later this year. Please check back with us mid-summer for an update. Thank you for your patience and support.


CrowdFiber Campaign - Customer Admin

12:04PM March 24, 2020

Vernon Hamman

I know you all are working as fast as possible considering all this rain but is there an idea of what quarter you will be working in the Half Pone rd area?


CrowdFiber Campaign - Customer Admin

7:22PM March 29, 2020

Vernon Hamman

Thanks for the reply you all stay safe out there


CrowdFiber Campaign - Customer Admin

8:42AM March 26, 2020

MLConnect Customer Cares Team

Thank you for supporting MLConnect and your patience. We estimate construction will begin in your area in the Q3 of this year. Stay tuned for updates!


CrowdFiber Campaign - Customer Admin

10:43AM March 16, 2020

Joshua Hamilton

When is Pinewood being targeted? Specifically, Hidden Valley Road.


CrowdFiber Campaign - Customer Admin

10:12AM March 19, 2020

MLConnect Customer Cares Team

Covering roughly 2600 miles in five rural areas is a big task, and we are happy to be on target for our end of 2022 goal. A timeframe for unserved areas in Hickman, Lewis and Perry counties such as yours will be available later this year. We appreciate your patience and understanding.


CrowdFiber Campaign - Customer Admin

3:49PM March 09, 2020

Shawna Hicks

Is that fiber being ran out 231 in McEwen? (Fingers Crossed!)


CrowdFiber Campaign - Customer Admin

11:16AM March 11, 2020

MLConnect Customer Cares Team

Construction is ongoing in portions of McEwen.


CrowdFiber Campaign - Customer Admin

5:18PM March 06, 2020

Marcee Duggar

I have been signed up for 2 years. Any Idea on Highway 13. I live in Houston county side 1\2 mile before Humphreys co??


CrowdFiber Campaign - Customer Admin

11:26AM March 11, 2020

MLConnect Customer Cares Team

MLConnect thanks you and all those who are waiting so patiently for fast, affordable, reliable - 100-percent broadband! Constructing a project of this size across five counties is a large commitment, and we are working as quickly as possible with the weather and rural landscape. We anticipate your specific location will be live in the third quarter of this year. Because you've registered with us online, a representative will contact you when installations begin.


CrowdFiber Campaign - Customer Admin

12:07PM March 06, 2020

Allison Kimble

When will it be available on Jarrett Lane in Linden TN?


CrowdFiber Campaign - Customer Admin

10:17AM March 19, 2020

MLConnect Customer Cares Team

A timeframe for unserved areas in Perry County such as yours will be available later this year. We appreciate your patience and understanding.


CrowdFiber Campaign - Customer Admin

6:17AM March 05, 2020

Alex B

Do you have a timeline for when Indian Creek Road in McEwen will finally have internet?


CrowdFiber Campaign - Customer Admin

10:16AM March 19, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us. Contact your local MLEC office with your full address, and they can provide an update more specific to your area. Take care!


CrowdFiber Campaign - Customer Admin

4:10PM March 03, 2020

jeremie Franklin

Any Idea when you will be down little hurricane creek road in mcewen...other than "later" this year. spring, summer, fall, winter?


CrowdFiber Campaign - Customer Admin

11:28AM March 11, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us. We anticipate some services will be live in your area by the third quarter of 2020. Of course weather and other unforeseen delays could influence this timeframe.


CrowdFiber Campaign - Customer Admin

8:55PM March 02, 2020

Lyle Bonnell

When will you have service all the way down Old Stewart road (Pond Ln.)??


CrowdFiber Campaign - Customer Admin

3:30PM March 03, 2020

MLConnect Customer Cares Team

Construction for the Pond Lane area of Tennessee Ridge is expected to be finished in the 3rd Quarter of 2020. Weather and other unexpected issues could cause a delay, but our goal is be live this fall.


CrowdFiber Campaign - Customer Admin

10:19AM February 29, 2020

Trev Humphreys

I signed up for your GB service a couple years ago... still waiting... but no service available in my area. 198 Potts Rd, Hohenwald Looks like you stopped your service area at the edge of the more populated areas near the Golf Course. Us folks a few miles on down they road need service too. Last fall I saw a guy in a ML Connect truck who said he was inspecting the poles in our area. That gave me some hope. I work from home and really need high speed internet. Any idea when you might make it out hwy 412 a bit more to Claude Carroll Road and Potts Rode residences ? Thanks


CrowdFiber Campaign - Customer Admin

1:03PM March 02, 2020

MLConnect Customer Cares Team

When MLEC announced the formation of MLConnect in August 2018, our goal was to finish construction to all interested members by the end of 2022. Covering roughly 2600 miles in five rural areas is a big task, and we are happy to be on target for that goal. A timeframe for unserved areas in Hickman, Lewis and Perry counties such as yours will be available later this year. We appreciate your patience and understanding.


CrowdFiber Campaign - Customer Admin

2:20PM February 26, 2020

Tina Coffelt

When will you be in area of old 49 hwy?


CrowdFiber Campaign - Customer Admin

12:42PM February 28, 2020

MLConnect Customer Cares Team

Thank you for reaching out to us. Contact your local MLEC office with your full address, and they can provide an update more specific to your area. Take care!


CrowdFiber Campaign - Customer Admin

8:33PM February 23, 2020

joseph turrentine

when will installations begin on herman clark road in erin? I noticed the site updated from "not where fiber is being built at this time" to " fill out this form and we will contact you". any specific time frame when that will happen? ive been looking forward to you guy coming out this way for atleast a year now and cant wait to be running at 1gbps


CrowdFiber Campaign - Customer Admin

11:12AM February 26, 2020

MLConnect Customer Cares Team

Your location is scheduled for construction later this year. Since you've registered with us online, a representative will reach out to you when installations begin. Stay tuned!


CrowdFiber Campaign - Customer Admin

5:58PM February 21, 2020

7608850738 Wishaw

I live at 947 bold springs rd in McEwen and I was wondering when I would be able to revive service ? I haven’t seen anyone working on the lines down my road


CrowdFiber Campaign - Customer Admin

11:12AM February 26, 2020

MLConnect Customer Cares Team

Your location is scheduled for construction later this year. Since you've registered with us online, a representative will reach out to you when installations begin. Stay tuned!


CrowdFiber Campaign - Customer Admin

2:36PM February 20, 2020

Diane Holloway

When will the Totty's Bend area be completed? Mainly on Mobley Ridge Road? Thanks


CrowdFiber Campaign - Customer Admin

11:07AM February 21, 2020

MLConnect Customer Cares Team

For Hickman County, we are currently doing installations for some areas of Centerville. Phases III and IV will include the remaining portions of Hickman, Lewis and Perry counties, but a timeframe will not be available until later this year. Our goal is to complete construction to everyone by the end of 2022.


CrowdFiber Campaign - Customer Admin

3:05PM February 17, 2020

Robert St Sauver

It looks like the lines and things are finished on Stewart Branch Rd in Hurricane Mills. Any idea on how long until installation?


CrowdFiber Campaign - Customer Admin

3:59PM February 17, 2020

MLConnect Customer Cares Team

Main line construction is nearing completion. If the weather holds, installations could begin in the next few months. Since you've registered with us online, you'll be contacted when installations start. Thank you!


CrowdFiber Campaign - Customer Admin

5:37PM February 12, 2020

Sidney Pate

what do the dark pink or purple and gray areas on map mean? as many pink areas on map i dont see how can be completed by Jan. of 2021 but hope so. keep my fingers crossed


CrowdFiber Campaign - Customer Admin

9:58AM February 14, 2020

MLConnect Customer Cares Team

The areas in pink are the remaining areas in Humphreys and Houston counties and are expected to have construction completed by the end of January 2021. Actual in-home/business installations will take a bit longer.


CrowdFiber Campaign - Customer Admin

2:23PM February 12, 2020

Brett Roberts

Our MLEC electric service in underground . Will the fiber be underground to our house too? Also our house is listed as phase 2, our address is 145 Langford Road Waverly, and I noticed that Tall Trees recently had the fiber lines and poles installed . Since we do get our electricity off HWY 70 versus Tall Trees grid , will we have access when Tall Trees internet becomes active? thanks


CrowdFiber Campaign - Customer Admin

9:56AM February 14, 2020

MLConnect Customer Cares Team

If your electric service is underground, the fiber to your home will be also. The service drop for underground takes a bit longer, so anyone who wishes, can have their fiber overhead. The rainy weather of late has slowed our progress; however, we expect to begin construction in your area in the next few months. Since you've registered with us online, an MLC representative will contact you when installations begin in your area.


CrowdFiber Campaign - Customer Admin

8:24AM February 12, 2020

MLConnect Customer Cares Team
Admin

Hi Bradley Road in MEwen! Depending on the weather and other variables, the goal is to complete construction and be live with installations in your area this summer.


CrowdFiber Campaign - Customer Admin

4:46PM February 11, 2020

Simon Devers

Saw that they ran cable lines on my property today at Bradley Road in McEwen today(we are located towards end near trace creek). This got us excited, how much closer are we to a installation date now?


CrowdFiber Campaign - Customer Admin

1:54PM February 10, 2020

MLConnect Customer Cares Team
Admin

In rental situations where the electric service is another name, the homeowner/landlord will need to sign a permission form prior to the installation being scheduled. You will receive a separate bill for your MLConnect service.


CrowdFiber Campaign - Customer Admin

4:08PM February 07, 2020

MLConnect Customer Cares Team
Admin

MLConnect is making progress further into the rural areas of Humphreys and Houston counties everyday. As for television, MLConnect speeds make streaming possible. Many customers are using this entertainment option instead of traditional satellite services.


CrowdFiber Campaign - Customer Admin

2:34PM February 06, 2020

Linda Brackett

I have seen the workers going up Old Blacktop RD any idea when we can get connected?


CrowdFiber Campaign - Customer Admin

7:29PM February 05, 2020

Gary Curtis

Are you able to predict the time frame for service on Little Blue Creek Road? Also, some folks are saying that with MLconnect we will be able to use it for TV and not require satellite service. Is that true?


CrowdFiber Campaign - Customer Admin

11:59PM January 31, 2020

Terri Pirtle

I am SO ready for Bakerville Road to be completed! ❤️❤️


CrowdFiber Campaign - Customer Admin

9:44AM January 20, 2020

MLConnect Customer Cares Team
Admin

Construction for Phase II, which includes all areas of Humphreys and Houston counties not included in Phase I, is expected to finish in January 2021. If you select the Service Areas tab on this website, areas in light green are in service now and scheduling installations. Areas in pink are included in Phase II.


CrowdFiber Campaign - Customer Admin

5:39PM January 16, 2020

Joey Hornick

I have seen MLConnect trucks on Old Nashville Hwy in McEwen. Any idea on a completion date in that area?


CrowdFiber Campaign - Customer Admin

8:48AM January 16, 2020

Stephanie Burney

As the list that showed the status of each are is no longer shown on this site, what is the best way to get an update of the status of our area? Thank you in advance.


CrowdFiber Campaign - Customer Admin

8:47AM January 14, 2020

MLConnect Customer Cares Team
Admin

Mr. Hux: At this time, you are scheduled for construction later in Phase II, which is currently under construction (some installations complete) and expected to span 15 months (finished in January 2021). Because you have registered with us online, we have a way to contact you when installations begin in your area.


CrowdFiber Campaign - Customer Admin

3:24PM February 09, 2020

Tony Hux
Admin

One other question I am a renter with electric included. Will I still be eligible to sign up under my name or will it have to be added to electric bill?


CrowdFiber Campaign - Customer Admin

10:58AM January 13, 2020

Tony Hux

The main line is now being ran down Old Blacktop Rd. from Gorman toward McEwen. Any idea when service will be available?


CrowdFiber Campaign - Customer Admin

8:08AM January 10, 2020

MLConnect Customer Cares Team
Admin

MLConnect currently does not offer wifi hotspots for members, but is an option we might consider doing in the future. However, MLEC offers a few select free hotspots in our service area that can be used for internet access. Check locations at this link: https://www.google.com/maps/d/u/0/embed?mid=z2AV8O9H2QJE.kMU05vce5oT4


CrowdFiber Campaign - Customer Admin

10:46AM December 19, 2019

Larry Traylor

Thanks for getting to the people without internet first we really appreciate it. If only right. You put it in places that already have internet available first. Now it's put back another year. Just a complete let down.


CrowdFiber Campaign - Customer Admin

3:53PM December 16, 2019

Zack Story

Will I be able to connect to ANY MLconnect wifi spot as long as I am a member? Or will there be any hotspots? Kind of like xfinity does.


CrowdFiber Campaign - Customer Admin

7:11AM December 15, 2019

Mary Hegenbart

I would like to hear some feedback from customers who now have the new service? You know some Pros and Cons.


CrowdFiber Campaign - Customer Admin

9:30AM October 24, 2019

MLConnect Customer Cares Team
Admin

MLConnect will be an option for all those living in the MLEC service area. The project is lengthy, but we are committed to reaching everyone in time. Progress is made every day, and we appreciate everyone's support.


CrowdFiber Campaign - Customer Admin

6:27PM October 23, 2019

anna pierce

I live in the Pineview area on the map at 47 Deer Run Road Lobelville Tn. I would love love to have better internet would save me hundreds in gas back and forth to Nashville everyday. Better internet means I could work from home ... I live in a area that I don’t think their are a lot of people in my area that will get it ? So does that mean I don’t get it ?


CrowdFiber Campaign - Customer Admin

5:14PM October 23, 2019

MLConnect Customer Cares Team
Admin

These are all great questions, and we're working to make an official announcement about Phase 2. As shared, MLEC/MLConnect is committed to making broadband an option for ALL MLEC members. It is not a matter of "if" but "when." Our goal is to complete construction by the end of 2022, but considering the amount of interest, it will take longer to finish home and business installations. Of course we would like to serve everyone at one time. Unfortunately, it is not possible. We appreciate your patience and support as we work to serve everyone.


CrowdFiber Campaign - Customer Admin

10:00AM October 20, 2019

Jessica Botkin

Please come to pineview!!! Lobelville. We have nothing here no access to net just satellite net. Lucky to even have phone signal out here!


CrowdFiber Campaign - Customer Admin

1:18PM October 19, 2019

Kristopher Bing

Was curious if you had a timeline for the 10-314 Brown Hollow area, very anxious to get good reliable service as soon as possible. Thanks.


CrowdFiber Campaign - Customer Admin

7:29PM October 18, 2019

Jessica Botkin

Mine is pineview I seen they wanted all of us from the outskirts of linden and lobelville to email yall if we want it in our area. We already signed a survey from mlconnect over a year ago saying we wanted this down here. I really hope yall are gonna come here we have nothing here cant even get Tds out here this is a complete dead zone. Please keeping moving forward on this list of future service areas. I cant wait for yall to come down here, so many of us are waiting on this!


CrowdFiber Campaign - Customer Admin

5:35PM October 16, 2019

Joey Hornick

So is there an expected start date for Phase 2?


CrowdFiber Campaign - Customer Admin

9:54PM October 15, 2019

William Dixon

Can you please help us understand this new phase 2 map, it appears like you're going to solely focus on Humphreys county and not give anyone in Lewis, Perry, or Hickman county any more growth until a different point in the future, is this going to be how it works? I'm sure most of us are very interested to understand how it works.


CrowdFiber Campaign - Customer Admin

5:24PM October 04, 2019

MLConnect Customer Cares Team
Admin

Thank you for contacting MLConnect and your interest in fast, affordable, reliable broadband and phone services. We offer no data limits, no contracts, FREE standard installation and hometown service. At this time, we are working on installations in the Phase I areas. While your zone (01-334 West To River) is not in Phase I, we are making progress with our Phase II construction in the rural areas every day. Look for an official update soon. Again, thank you for your interest and support. We look forward to serving you.


CrowdFiber Campaign - Customer Admin

6:18PM September 23, 2019

Pete Schofield

When is 01-334 West to River going to be slated to move forward. It says it is still reviewing interest. My residence is only a mile or two from where service is already established in Tennessee Ridge


CrowdFiber Campaign - Customer Admin

11:43AM September 10, 2019

MLConnect Customer Cares Team
Admin

We are continuing and will make broadband an option to all MLEC members. As shared in an earlier post, the map section of our webiste is undergoing some changes, so your zone name is the best indicator of construction progress for your area. From construction to installation, there are several steps in the process, and it will take time to reach everyone. MLConnect continues to make progress every day. We appreciate your patience and support.


CrowdFiber Campaign - Customer Admin

8:38PM September 09, 2019

Kevin Rist

On your map I am under the Phase 1 color, 01-354 Hwy 49 East/Hwy 13 North , You are not going to change that are you? I am so tired of having crappy internet it's not funny! On My Dashboard I now have a Goal bar that wasn't there before. Does that mean that it has started? We already have the fiber optic lines laid.


CrowdFiber Campaign - Customer Admin

6:10PM September 09, 2019

MLConnect Customer Cares Team
Admin

Different colors on the Service Area maps relate to different stages of construction. Currently, this portion of our website is undergoing changes. If we can clarify anything about your zone, please contact us for personal assistance.


CrowdFiber Campaign - Customer Admin

6:09PM September 09, 2019

MLConnect Customer Cares Team
Admin

Construction is currently underway in Phase I areas of McEwen, and we hope to announce a "go live" date for in-home installations to begin in the next few weeks.


CrowdFiber Campaign - Customer Admin

6:08PM September 09, 2019

MLConnect Customer Cares Team
Admin

Zones are designated according to your address. If your zone does not look correct, please contact your local MLEC office for assistance. When registering, some will enter abbreviations such as Rd, Ln, and there may be more than one Smith Rd, etc. in our five counties.


CrowdFiber Campaign - Customer Admin

10:15PM September 05, 2019

Kevin Rist

On your map under the Service Areas, could you tell me what each color represents? Thank you.


CrowdFiber Campaign - Customer Admin

4:47AM September 02, 2019

Anthony Martin

Any information about McEwen? Im in phase I area.


CrowdFiber Campaign - Customer Admin

6:51PM August 24, 2019

Rita Choate

My are is saying Pleasantville, yet my address is Waverly. Is that correct?


CrowdFiber Campaign - Customer Admin

2:47PM August 21, 2019

MLConnect Customer Cares Team
Admin

Your address places you in a zone labeled as 07-324 Pleasantville. Areas are grouped geographically by zones (not necessarily by the city name) and indicate the area with which construction for your location is scheduled to be completed. If you feel the location is incorrect, please email us at customercare@mlconnect.com with your mailing address and reference "zone check" in the subject line. Thank you for reaching out to us and the opportunity to be of service.


CrowdFiber Campaign - Customer Admin

7:03PM August 20, 2019

denise fair

My area is saying pleasantville yet my address is linden. How does that work?


CrowdFiber Campaign - Customer Admin

11:03AM August 14, 2019

MLConnect Customer Cares Team
Admin

The numbers associated with a registration, such as 06-364 are the location's zone. Phase I zones include those with the name of a city followed by numbers, for example New Johnsonville 04-2140. Phases II, III, and IV are numbers followed by a location, such as 06-364 Coble.


CrowdFiber Campaign - Customer Admin

11:00AM August 14, 2019

MLConnect Customer Cares Team
Admin

Dudley Brooks Loop is not in Phase 1 (scheduled for completion in 2019); however, we are committed to making service an option for everyone served by MLEC and hope to finish construction by the end of 2022. Phase II is currently being designed and announcement will be made in a few months.


CrowdFiber Campaign - Customer Admin

10:56AM August 14, 2019

MLConnect Customer Cares Team
Admin

Waverly DA 11-3440 is currently scheduling installations. Your local MLEC office can provide sign-up assistance.


CrowdFiber Campaign - Customer Admin

10:53AM August 14, 2019

MLConnect Customer Cares Team
Admin

Although a user might only "register" one sight, you can let us know when we contact you that you would like to add additional addresses. Or, you can also register the other addresses, but a different email address will be needed. However, keep in mind that different physical addresses might not be able to be installed at one time because they may be outside of Phase I.


CrowdFiber Campaign - Customer Admin

11:22AM August 13, 2019

Verdia Long

Can you tell me how long of a wait time I have to get connected in area DA 11-3440? Thanks.


CrowdFiber Campaign - Customer Admin

9:36PM August 12, 2019

cindy courtney

Could you tell me when the internet will be available on Dickson highway?my address is 45 Dudley Brooks Loop Erin Tn 37061


CrowdFiber Campaign - Customer Admin

4:43PM August 10, 2019

Verdia Long

I am in DA 11-3440 Hillhaven area. I registered to get connected the end of July. Comcast jacked my rate on me by $40 due to my contract running out. I am cancelling Comcast on Monday. Can you give me an idea of when I will be able to get connected? Thanks!


CrowdFiber Campaign - Customer Admin

6:05PM August 09, 2019

Elizabeth Harrington

Can you tell me what these numbers mean...06-364


CrowdFiber Campaign - Customer Admin

9:07PM August 07, 2019

vanessa mealer

we currently have internet thru the phone co, and it does have issues a lot. can you give me a time frame for your fiber to reach our neighborhood? the first of the two companies to bring it will get our business, and that of my neighbors who are also fed up with the work sometimes internet service we have.


CrowdFiber Campaign - Customer Admin

12:35PM August 05, 2019

Melinda Phair

Though I only put our address on the "interested" site, there are two other homes on our farm that would be interested in this.


CrowdFiber Campaign - Customer Admin

12:08PM July 29, 2019

MLConnect Customer Cares Team
Admin

Phase I (in and around the cities like Erin and Tennessee Ridge) will complete construction in 2019. Areas selected for Phase II and beyond are being evaluated with an announcement coming in a few months. Because you have registered with us online, we have a way to contact you when construction and installations begin in your area.


CrowdFiber Campaign - Customer Admin

5:20AM July 29, 2019

Camille Lashlee

What are plans/ timeframe for Danville, McKinnon, Stewart area on HWY 147 in western Houston County?


CrowdFiber Campaign - Customer Admin

11:10AM July 17, 2019

MLConnect Customer Cares Team
Admin

At this time, your location - 11-314 Ridge Road Zone - is not scheduled for Phase I (construction to be completed in 2019). Areas selected for Phase II and beyond are being evaluated with an announcement coming in a few months. Because you have registered with us online, we have a way to contact you when construction and installations begin in your area. Again, thank you for reaching out to us. We appreciate your understanding and patience as we work toward a common goal - FAST, reliable broadband for our rural hometowns.


CrowdFiber Campaign - Customer Admin

12:25PM July 12, 2019

Josh Elam

Hello, I'm in 11-314 Ridge Rd. zone on Old 13 about 2 miles from Buffalo/I40....i think quite literally at the end of our service branch. Had a surveyor come by a few weeks ago to (I guess) geotag the pole. He mentioned it was for fiber. Does this mean you're moving past the gauging interest stage and moving toward install? Any sort of time frame I can hope for? Just want to know so I can manage my Hughes account accordingly (don't want to contract for longer than I need). REALLY WANT THE FIBER!! Thanks!


CrowdFiber Campaign - Customer Admin

8:21AM July 11, 2019

MLConnect Customer Cares Team
Admin

Thank you for your question! At this time, construction is expected to finish in 2019 for areas in orange.


CrowdFiber Campaign - Customer Admin

3:04PM July 10, 2019

Michael Akridge

Can you confirm that orange shaded areas of the map are in the Phase 1 zone? I saw an earlier post that stated that only Phase 1 areas were highlighted and wanted to ensure this includes all colors. If so, my understanding is that this area (Asbury Dr, New Johnsonville) will be serviced by the end of 2019.


CrowdFiber Campaign - Customer Admin

4:03PM July 08, 2019

MLConnect Customer Cares Team
Admin

Mr. Wilson: Construction is underway in Phase I areas of McEwen. MLConnect is on target to complete construction in all Phase I areas in 2019.


CrowdFiber Campaign - Customer Admin

4:00PM July 08, 2019

MLConnect Customer Cares Team
Admin

Kunal: Our online system is experiencing some issues. To verify the zone for your location, please email your service address to customercare@mlconnect.com. We apologize for this inconvenience.


CrowdFiber Campaign - Customer Admin

3:09PM July 08, 2019

MLConnect Customer Cares Team
Admin

Mr Rist: Your online registration shows a different location than Phase I. We will email you shortly to verify your location and provide additional assistance. Thank you for bringing this to our attention.


CrowdFiber Campaign - Customer Admin

2:30PM July 08, 2019

Kunal Mitra

Service area 06-364 Coble says Currently Installing - Signup now ! Is it really being installed at this point ? If not can you let us know about a possible time frame,


CrowdFiber Campaign - Customer Admin

8:04AM July 08, 2019

Samuel Wilson

Hi All, Just wondering if there is an update of a timeline as to when they will start the construction in McEwen TN. Also is expectation still that phase 1 construction will be complete this year? Thanks!


CrowdFiber Campaign - Customer Admin

3:51PM July 03, 2019

Kevin Rist

Why does the map online show different areas to where phase 1 is then the map in the office? Online states that my area is in fact in phase 1. So am I or am I not in phase 1? I am so excited about having an internet that works in my area. Thank you in advance for your time.


CrowdFiber Campaign - Customer Admin

7:51AM July 03, 2019

MLConnect Customer Cares Team
Admin

Thank you for your comments, Mr. Betz. We always want to keep the lines of communication open and provide answers on this project. The website experienced an outage yesterday and your comments were missed. The colors on the SERVICE AREA page map correspond to stages the areas are in. Below the map on that page, the colors correspond to a different message about that area. Only Phase I areas are highlighted at this time. As shared in the beginning, MLConnect is committed to serving ALL areas. The grants received are designated for specific areas, and these are in the design stage. As the system is built out, more rural areas are being included but it will take time to reach everyone. Again, thank you for your comments and this opportunity to share information.


CrowdFiber Campaign - Customer Admin

3:20PM July 02, 2019

James Betz

Strange, my comment did not get posted. I will try again.Ms. Harrington is correct in her question. The rural areas are always last to be serviced. The city has acce to all kinds of internet providers at high speed. If the infrastructure is in place it's just a matter of running cable. How ever if it is broadband internet over the power lines it just a matter of installing repeaters.


CrowdFiber Campaign - Customer Admin

12:59AM July 02, 2019

James Betz

It would really be professional if you would explain what the colors represent on your service MAP. Being an electrical engineer that answer you gave the lady about why the rural areas are last is phony, once the "infrastructure" is in place to service the city it's just a matter of running cable. Unless it's broadband via the power grid, which would not require extra cable, right. The people in the RURAL areas are always last to get anything. And like she said in the city people have access to several internet services. So how about an honest answer?


CrowdFiber Campaign - Customer Admin

3:59PM June 12, 2019

MLConnect Customer Cares Team
Admin

Thank you for supporting MLConnect! Like building the electric system 80 years ago, building a fast, affordable, reliable broadband network will take time. However, we are striving to complete constructin in all five counties by the end of 2022. We are committed to making world-class broadband and hometown service an option for ALL MLEC members. If you have not already, please register with us online by entering your address and picking a potential product. Then, when we are working in your area, we'll have a way to contact you and confirm the order.


CrowdFiber Campaign - Customer Admin

3:56PM June 12, 2019

MLConnect Customer Cares Team
Admin

Great question! We started in the cities because we have to build a reliable infrastructure before we can build out in the rural areas - kind of like an electric substation has to be centrally located and building out from there.


CrowdFiber Campaign - Customer Admin

3:59PM June 11, 2019

Elizabeth Harrington

Can someone tell me why people in the city limits get the service before people in the rural areas? People in the city limits have excess to all kind of internet, while I'm still stuck with satellite ? Thank you.


CrowdFiber Campaign - Customer Admin

9:52AM June 11, 2019

Tim Slade

I live on Hwy 7 South at the Hickman / Maury county line. Any timeline ideas on when we would be getting service. I saw some new power poles go up a couple of months ago at my property line. Are these going to be utilized for the new internet service ?


CrowdFiber Campaign - Customer Admin

4:05PM June 09, 2019

Claudine Bruyns

On the update page of this site, the last post was February 21st. I know a lot of work has been done on the network. Would someone be able to post an update with an overview of the progress and status, please? We are so excited to know that this service is in progress and will be installed in our homes and businesses soon.


CrowdFiber Campaign - Customer Admin

8:00AM June 04, 2019

MLConnect Customer Cares Team
Admin

Our goal is to serve Phase I areas of New Johnsonville in 2019. A specific date for when installations will begin is not available at this time. Since you have registered with us online, an MLConnect representative will contact you when we are working in your area. Thank you for the email and support! ​


CrowdFiber Campaign - Customer Admin

2:17PM May 29, 2019

mary lee lowe

How will we know when we will be live? We have seen contractors on our street and around town (New Johnsonville), but no info regarding how we will be notified that service is up and running. Thanks


CrowdFiber Campaign - Customer Admin

9:32PM May 18, 2019

Daniel Norton

Daniel Norton Grinder Creek Road Hohenwald. My wife and I have lived in areas ( Houston,TX- Washington.D ) that have had high speed internet and enjoyed it very much. We do not have TV as we find TV very Worldly and not to our liking. We were only able to install satellite internet and are restricted to 50 GIG a month with poor quality, slow seeds in the evenings, and inop when a storm is in the area. We will be so happy when ML Connect puts in our 1 GIG package, Telephone service where we can STREAM MOVIES & other things.. GO GO GO ML CONNECT.


CrowdFiber Campaign - Customer Admin

4:27PM May 14, 2019

MLConnect Customer Cares Team
Admin

Thank you for your support! We are excited to bring fast, affordable, reliable broadband to all MLEC members in Hickman, Houston, Humphreys, Lewis and Perry counties. Residential services begin at 300 Mbps for $49.95. Check the "Products" tab for full information. Phase I (in and around the cities of our service territory) will serve as a reliable infrastructure for the entire five-county project and construction is expected to finish in 2019. Phase II areas are still under development, and we will make an announcement about this soon. However, we are committed to making broadband an option for ALL MLEC members by the end of 2022. Again, thank you for reaching out to us. Follow us on Facebook and Twitter for updates.


CrowdFiber Campaign - Customer Admin

12:23AM May 12, 2019

James Allen

I used to live in civilized areas of this world like Germany and Colorado Springs and the Denver area. I have always had cable internet and it's usually very expensive. Usually 150 Mbs was considered fast and they would charge about $90. So after looking over your pricing for your services for data speeds, paying about $80 or slightly more for 1 GB of data speed kinda makes me hesitant to believe what I am seeing. We currently have Viasat and we are paying about $150 for 50 Mbs which is the fastest satellite internet we could find. And if a cloud flies over us the internet dies out or they will throttle us during peak hours to around 10 Mbs. 10 Mbs is nearly dialup days slow and it's a constant source of frustration for us. All I can say is if you do put in this internet cable or fiber ( I am guessing its fiber due to the 1 GB option ). But if you do this I will be eternally grateful to you guys. I feel like my hopes are being raised just to have them dashed because so many goobers out here think cable internet also means you haft to have the TV packages even though you have stated clearly thats not the case. I hope this happens so we can happily get rid of satelite.


CrowdFiber Campaign - Customer Admin

1:57PM May 09, 2019

Terrell Lindsey

I’m inquiring about a more accurate time line as to when internet services will be available for my address. It looks as if the installment stopped one road before mine which is disappointing considering we’ve been waiting 13 years for any kind of internet service and the areas serviced already have multiple internet options available to them. I was very excited to hear about possible opportunities to connect but now from news sources it’s looking like it will be a few more years before we have options. Our home is less than four miles from town and 2 miles from hwy 20/Summertown hwy so it’s not like we are way out on the other side of the county. I would appreciate any new accurate updates you could provide. Thank you.


CrowdFiber Campaign - Customer Admin

8:47PM April 18, 2019

MLConnect Customer Cares Team
Admin

While MLConnect will not offer TV services, our fast, reliable speeds will make video streaming readily available for services such as YouTube TV, Hulu, Netflix, etc. To learn more about streaming, check our website FAQs: http://www.mlconnect.com/faqs.


CrowdFiber Campaign - Customer Admin

8:43PM April 18, 2019

MLConnect Customer Cares Team
Admin

Thank you for supporting MLConnect. Like building the electric system 80 years ago, building a fast, affordable, reliable broadband network will take time. However, we are committed to making world-class broadband and hometown service an option for ALL MLEC members by the end of 2022. If you have not already, please register with us online by entering your address and picking a potential product. Then, when we are working in your area, we'll have a way to contact you and confirm the order.


CrowdFiber Campaign - Customer Admin

8:35PM April 17, 2019

Elizabeth Harrington

I heard that you will be including TV service. Is this true?


CrowdFiber Campaign - Customer Admin

1:56PM April 17, 2019

Nettie Hinson

Are we going to get this on Piney Creek Road.


CrowdFiber Campaign - Customer Admin

4:23PM April 01, 2019

MLConnect Customer Cares Team
Admin

Like building the electric system 80 years ago, building a fast, affordable, reliable broadband network will take time and starts with a strong foundation. Our goal is to serve all areas by the end of 2022. MLConnect is using a phase construction approach to build a reliable infrastructure for the entire five-county project. Services are being installed in Waverly, and construction is ongoing in Hohenwald and Centerville. After this, we will move to (in order) New Johnsonville, Erin, Tennessee Ridge, McEwen, Linden then Lobelville. It is our goal to have these all ready for service in 2019. We applied for six grants under the Tennessee Broadband Accessibility Grant Program and received one for a section of rural Humphreys County. We will apply for additional grand funds in the future. It will take time to cover MLEC's entire service territory, but we are committed to the task.


CrowdFiber Campaign - Customer Admin

1:44PM March 31, 2019

Susan Trainor-Baisden

So it looks like Phase 1 is pretty much the same people in Hohenwald that already have access to Spectrum and other broadband Providers. I thought that the grant was made to deliver internet options other than satellite to people in Rural areas. To me that would be people outside of the areas that already have options. I'm sort of disappointed. 3 years to wait sucks.


CrowdFiber Campaign - Customer Admin

12:40PM March 25, 2019

MLConnect Customer Cares Team
Admin

Registrations/sign-ups are now open for those living in the Phase I area of Waverly! Once you register, MLConnect will contact you to confirm your order and set up the installation.


CrowdFiber Campaign - Customer Admin

8:08PM March 15, 2019

Christopher Wilcher

With go live on the 18th for Waverly when should registration start for those in Waverly area


CrowdFiber Campaign - Customer Admin

8:48AM February 28, 2019

MLConnect Customer Cares Team
Admin

All areas receiving electricity from MLEC will have the opportunity for service. If you have questions related specifically to your location, please email your address and a phone number to customercare@mlconnect.com.


CrowdFiber Campaign - Customer Admin

3:21PM February 25, 2019

Michael Malone

You now if you will be running it out 13 north or not?


CrowdFiber Campaign - Customer Admin

9:02AM February 11, 2019

MLConnect Customer Cares Team
Admin

MLConnect's original goal was to serve Coble and other areas outside of Phase I by the end of 2022. We're excited about the potential of moving that goal closer with the help of grants and other factors. As Phase I nears the end, Phase II will be designed. Areas selected for Phase II will be based on construction costs, existing infrastructure, time constraints, etc. Another determining factor is the amount of interest in each neighborhood (number of online registrations). This is why registering on the website is SO IMPORTANT. For example, if there are 50 houses on a road and only 4 registered, another location with 20 houses and 15 registrations looks to have more interest. High registration does not guarantee a neighborhood’s inclusion in the next phase, but more interest can increase its chances. Encouraging your neighbors to register as well would be a great help. Registration is not an obligation to buy, but shows area interest, helps guide future construction, and provides a way to contact you when broadband signups begin in their area.​ Follow us on Facebook, Twitter and http://www.mlconnect.com for updates.


CrowdFiber Campaign - Customer Admin

3:32PM February 10, 2019

William Dixon

So like I live barely into the coble zone how long do you think it'll take to upgrade me from sub mbps internet? till 2020? 2021? Don't hit me with that 'We'll get to ya when we get to ya' stuff though.


CrowdFiber Campaign - Customer Admin

11:23AM January 23, 2019

MLConnect Customer Cares Team
Admin

Like building the electric system, MLConnect will build out its broadband system to create the infrastructure first (connecting the cities). This is an important first step toward a fast, reliable broadband system to serve all five counties. We would be happy to verify if a specific location is in Phase I. Just email a physical address to customercare@mlconnect.com.


CrowdFiber Campaign - Customer Admin

5:44PM January 18, 2019

James Betz

As is the case with every high speed internet provider, those of us outside of town are pushed aside. The area in Orange has access to cable and other high speed internet, while we are always just 2miles from any access. Just the way it's always been and always will be. Thanks anyway but I will search for a more promising available internet.


CrowdFiber Campaign - Customer Admin

3:54PM January 17, 2019

James Betz

Would it be possible to have the areas in phase one identified?


CrowdFiber Campaign - Customer Admin

9:49AM January 16, 2019

MLConnect Customer Cares Team
Admin

All areas inside Phase I are expected to be live and begin receiving service in 2019. The other phases have not be designed at this time and locations not assigned to a particular phase. However, we anticipate all MLEC areas in all five counties will be completed in four years.


CrowdFiber Campaign - Customer Admin

7:01PM January 15, 2019

Charles Gilreath

I’m on Highway 13 S ,right past coop , I have signed up and it said Congratulations your in phase one , will this area be done this year ? Thank you for your time !


CrowdFiber Campaign - Customer Admin

1:47PM January 15, 2019

Jerry Colbert

So when will those in Phase 1 receive Internet in their homes?


CrowdFiber Campaign - Customer Admin

12:24PM January 15, 2019

Rachel Dyer

How soon to our area? 2years?


CrowdFiber Campaign - Customer Admin

5:53PM January 14, 2019

MLConnect Customer Cares Team
Admin

Great question! If NOT registered on our website, enter your address, select “residential” or “commercial” and then “Search For My Address.” If the next screen says, “Congratulations, your address is in the design stage,” you are in Phase I. Whether or not you are in Phase I, pick products you are interested in and click “Submit.” (Not an obligation to buy but registers interest and gives us a way to contact you when we are working in your area.) If you HAVE already registered, sign in or click on "Service Areas" above. From here, you can zoom in on the map. Areas in orange are in Phase I. The first MLConnect phase for broadband construction will help build the entire project’s infrastructure and must be built before we can move out to the more rural areas. But, we're coming! Other phases have not been designed at this time. To learn more about our phase approach and how you can register your area, check our FAQ section.


CrowdFiber Campaign - Customer Admin

2:40PM January 13, 2019

James Betz

The service area MAP explains very little. It needs more explanation about what the colors are telling us. Please post what the colors are telling us or what they represent. It seems like the areas in town have access to all kinds of high speed internet, but those of us who live outside of town are treated like we don't exist.


CrowdFiber Campaign - Customer Admin

10:56AM January 04, 2019

MLConnect Customer Cares Team
Admin

Our rural hometowns - areas other providers have overlooked - are in immediate need of fast, affordable, reliable broadband for many reasons. This is why Meriwether Lewis Electric Cooperative stepped forward to establish MLConnect and help build our communities for the future. While we will not be offering tv packages as a service, the broadband speed offered by MLConnect will make streaming for programs such as Netflix, Hulu, etc. a viable option.


CrowdFiber Campaign - Customer Admin

4:35PM December 22, 2018

anna pierce

Please Please get to me.........sat sucks ! ! !! slow and always goes out in a storm......so can not wait ! ! !


CrowdFiber Campaign - Customer Admin

7:15AM December 22, 2018

Marion Bloom

Will you bundle with tv supplier such as Directv or Dish as another option. Thanks.


CrowdFiber Campaign - Customer Admin

2:04PM December 14, 2018

Charles Gilreath

I saw the ML team with cable on highway 13 s right before Co-Op , my house is 2 houses down from there on Highway 13 s , any updates on when I'm getting service , I have already signed up , thank you in advance


CrowdFiber Campaign - Customer Admin

9:43AM December 02, 2018

Ray Blankenship

BE GREAT IF TV SERVICE LIKE DIRECT TV OR DISH NETWORK OR COMCAST COULD BE INCLUDED. MAYBE IT WOULD NOT GO OUT EVERY TIME A SPRING SHOWER OR JUST A CLOUD CAME OVER..


CrowdFiber Campaign - Customer Admin

1:16PM November 06, 2018

Alan Greenleaf

About how long will it be before we get it? Will you be eventually getting Tv also?


CrowdFiber Campaign - Customer Admin

2:59PM October 11, 2018

MLConnect Customer Cares Team
Admin

Our first phase includes in and around the cities within each of the counties MLEC serves. First up are Waverly, Hohenwald and Centerville. After that, we'll be building out in the other cities in this order to complete Phase I in 2019: New Johnsonville, Erin, Tennessee Ridge, McEwen, Linden and Lobelville. The first MLConnect phase for broadband construction will help build the entire project’s infrastructure. After that, areas where members have logged interest will help guide the projects’ progress. Click “I’m Interested” on www.mlconnect.com to log your interest with no obligation to buy.


CrowdFiber Campaign - Customer Admin

7:25PM October 07, 2018

Jason Preisner

So on the Service Area map, is the dark yellow sections right around the town centers the 2019 buildout or the blue/purple/yellow areas going to be built in 2019?


CrowdFiber Campaign - Customer Admin

12:19PM September 16, 2018

Victoria Gordon

No one wants to service any new areas on Highway 7 it seems. AT&T has not offered to extend anything even 1 more house. Comcast also has service in the Lyles area, but they also will not extend. Finally, someone listed the location in their service area. Wish we didn't have to do some sort of costly satellite with contract to get internet before this gets ready.


CrowdFiber Campaign - Customer Admin

4:04PM September 14, 2018

James Betz

It was great to hear MLEC is going to provide Broadband, something much needed in our area. I was wondering if there is a possible date as to when we will see this become reality.


CrowdFiber Campaign - Customer Admin

5:54AM September 12, 2018

James Betz

Where on the site do we go to get updates on when service will be available?.


CrowdFiber Campaign - Customer Admin

2:30PM August 25, 2018

Eric Merideth

We have been looking forward to having a good internet service for some time. It will be nice to get a good price without having to negotiate prices, packages etc every year. Way to go MLEC!!!